Bonneville Dam (Or. and Wash.) -- Photographs
Subject
Subject Source: Local sources
Found in 112 Collections and/or Records:
Spillway Bonneville Dam 6-12-36. 58. [Panorama of construction of spillway, includes high wire.], 1936 Jun 12
Item
Identifier: PH203_020_063
Spillway Bonneville Dam 11-1-36. [Panorama of Spillway construction.], 1936 Nov 1
Item
Identifier: PH203_020_093
Spillway, Bonneville Dam, Power House. 4-13-36 Oliver 53. [Panorama of construction of Bonneville Dam. Sign on crane reads "Washington Iron Works".], 1936 Apr 13
Item
Identifier: PH203_020_040
Spillway Dam Bonneville. [Panoramic of Spillway dam construction.], 1935 Aug 2
Item
Identifier: PH203_020_003
Taken about Aug. 10, 1936. [Construction of dam, with water flowing through, high wire visible.], 1936 Aug 10
Item
Identifier: PH203_020_064
Taken about Aug. 10, 1936. [Construction of dam, with water flowing through, high wire visible, group of men standing near tool house.], 1936 Aug 10
Item
Identifier: PH203_020_068
Taken April 1, 1936 at Bonneville Dam bunk-houses. Mt. Murna in background. [Man walking across snow covered parking lot. Sign on store in background "National Commissary Co. Inc.".], 1936 Apr 1
Item
Identifier: PH203_020_038
Taken Feb. 1936 Temp 10-20 degrees at cave on Tanner Creek. Men-2 workers at Bonneville Dam. [Man with pipe and man with rifle standing in front of ice covered cave.], 1936 Feb
Item
Identifier: PH203_020_045
Taken March 19, 1936. Cofferdam blasted March 16, 1936 (2 tons powder) at 6:45 am. Cofferdam on East side of piers. [debris in water against berm. "Safety Counts" sign on background.], 1936 Mar 19
Item
Identifier: PH203_020_036
taken March 19, 1936. [Workers sawing timber for dam construction.], 1936 Mar 19
Item
Identifier: PH203_020_032
Tanner Creek Falls at Bonneville. [ice covered waterfall.], not yet assigned
Item
Identifier: PH203_020_037
Dates:
not yet assigned
Tool house abt 36 tons carried around by high line (2 hi lines working together). [Tool shop building.], not yet assigned
Item
Identifier: PH203_020_023
Dates:
not yet assigned
Tool house. [Signs on building read "Pipe Shop" Work Shop" "Tool Room" "Stretcher in Tool Room" "Important All men quitting or laid off must first check out at the field office".], not yet assigned
Item
Identifier: PH203_020_022
Dates:
not yet assigned
[tractor on high line being moved during construction.], 1935 Sep
Item
Identifier: PH203_020_008
Tractor on high line Sept. 1935. [tractor on high line being moved during construction.], 1935 Sep
Item
Identifier: PH203_020_007
[tractor pulling 16 wheeled dirt container, being filled by scoop on high wire.], not yet assigned
Item
Identifier: PH203_020_014
Dates:
not yet assigned
[Two women standing reading newspaper, presumably on sternwheeler.], not yet assigned
Item
Identifier: PH203_020_058
Dates:
not yet assigned
Upstream Cofferdam cribbing North side. [Construction of Cofferdam .], not yet assigned
Item
Identifier: PH203_020_074
Dates:
not yet assigned
U/S Cofferdam Aug 1936. [Construction of Cofferdam .], 1936 Aug
Item
Identifier: PH203_020_078
[Water flowing through construction of spillway.], not yet assigned
Item
Identifier: PH203_020_092
Dates:
not yet assigned
Woods around shack at Bonneville looking out one window. [snow covered trees.], not yet assigned
Item
Identifier: PH203_020_046
Dates:
not yet assigned
[Workers working with rebar during construction of spillway.], not yet assigned
Item
Identifier: PH203_020_028
Dates:
not yet assigned